Storm Water Permits, Forms and Check Lists

Grading and Erosion Control Permit

You must have an approved set of signed and dated Construction Plans and a Storm Water Permit before you start work.  A Grading and Erosion Control Permit is for anyone that is disturbing more than 10,000 square feet of land.

Drainage Plan and Calculation Review Check List

The Drainage Plan and Drainage Calculation Review Check List is to check submittals for General Project Information, Construction Plans, Drainage Computations and Permit Approval and Documentation. 

Erosion Prevention and Sediment Control Plan and SWPPP Review Check List

The Erosion Prevention and Sediment Control Plan and SWPPP Review Check List ensures that General Requirements, Additional SWPPP Requirement for Discharges into Impaired or Exceptional Tennessee Waters and that SWPPP Requirements for Permanent (Post-Development) Storm Water Management have been checked and included as applicable.